Skip to main content

SCDOT Presents Alternative Configurations for IOP Connector

On Tuesday, December 13, 2022, SCDOT presented five alternative configurations for the IOP Connector (PDF, 1.98 MB). SCDOT hired RK&K, civil engineer consultant, to perform a comprehensive analysis of existing conditions of the bridge and develop recommendations for operational improvements to move traffic on and off the island more efficiently. 

SCDOT's study requirements included the following: Continue to provide bike and pedestrian accommodations on the bridge, minimum 11-foot travel lanes in each direction, minimum 4-foot shy lane for the concepts that have vehicular traffic closer to the edge of the bridge, minimum 1-foot shy line for the multi-use path side, 10-foot minimum for the multi-use path, avoid pedestrian/bike traffic crossing in front of vehicular traffic. 

SCDOT will present the alternative configurations to Mount Pleasant's Town Council in January 2023, followed by a 30-day public comment period. 

The video of the presentation is available here.